S4992
Referred to committee
A bill to require the Secretary of the Army to issue guidance relating to the review of applications for alteration or temporary or permanent occupation or use of certain hydropower projects, and for other purposes.
- Federal
- Senate
- Introduced Jul 15, 2026
- Session 119
Bill Text
Version ISIn this section:
The term completeness review means a review by the Secretary (or a designee) regarding whether a section 408 application is complete.
The term hydropower project means any non-Federal hydropower project requiring a license or exemption under the Federal Power Act (16 U.S.C. 791a et seq.).
The term Secretary means the Secretary of the Army.
The term section 408 application means an application relating to a hydropower project for permission under section 14 of the Act of March 3, 1899 (30 Stat. 1152, chapter 425; 33 U.S.C. 408), for an alteration, or temporary or permanent occupation or use, described in subsection (a) of that section.
Not later than 1 year after the date of enactment of this Act, the Secretary shall issue guidance establishing the following:
A standardized checklist of required materials for section 408 applications, to be developed in consultation with—
the Federal Energy Regulatory Commission;
the Hydroelectric Design Center of the Corps of Engineers;
hydropower project operators; and
relevant industry associations.
A clear description of what constitutes a complete section 408 application, including with respect to—
required documents and analyses;
formatting and submission requirements; and
evidence of compliance with any applicable Federal Energy Regulatory Commission license.
For section 408 applications for which a phased design review is required—
the specific scope and objectives of each review phase;
a timeline for each review phase;
an applicable definition of the terms fatal flaw, final quality assurance, and technical review; and
a clear statement that a completeness review shall not include—
detailed technical analysis; or
any engineering-related judgment with respect to design adequacy.
Procedures for referring a section 408 application to the head of the applicable Division Office of the Corps of Engineers or an official at the Corps of Engineers headquarters in any case in which a deadline applicable to the section 408 application is not met.
The guidance issued under paragraph (1) shall establish that a completeness review shall be limited to verification that—
all required documents have been submitted;
those documents are in the required format; and
the section 408 application addresses the applicable requirements of the checklist under paragraph (1)(A).
In conducting a completeness review, the Secretary (or a designee) may not—
conduct a detailed technical review of any engineering calculations;
evaluate the design adequacy of, or alternative approaches to, the hydropower project that is the subject of the section 408 application;
request any design modification to, or additional analysis of, the hydropower project that is the subject of the section 408 application;
consider any factor other than a factor included in the standardized checklist under paragraph (1)(A); or
require compliance with any environmental standard that was not established by a Federal or relevant State agency before the date of submission of the section 408 application.
The term completeness review means a review by the Secretary (or a designee) regarding whether a section 408 application is complete.
The term hydropower project means any non-Federal hydropower project requiring a license or exemption under the Federal Power Act (16 U.S.C. 791a et seq.).
The term Secretary means the Secretary of the Army.
The term section 408 application means an application relating to a hydropower project for permission under section 14 of the Act of March 3, 1899 (30 Stat. 1152, chapter 425; 33 U.S.C. 408), for an alteration, or temporary or permanent occupation or use, described in subsection (a) of that section.
Not later than 1 year after the date of enactment of this Act, the Secretary shall issue guidance establishing the following:
A standardized checklist of required materials for section 408 applications, to be developed in consultation with—
the Federal Energy Regulatory Commission;
the Hydroelectric Design Center of the Corps of Engineers;
hydropower project operators; and
relevant industry associations.
A clear description of what constitutes a complete section 408 application, including with respect to—
required documents and analyses;
formatting and submission requirements; and
evidence of compliance with any applicable Federal Energy Regulatory Commission license.
For section 408 applications for which a phased design review is required—
the specific scope and objectives of each review phase;
a timeline for each review phase;
an applicable definition of the terms fatal flaw, final quality assurance, and technical review; and
a clear statement that a completeness review shall not include—
detailed technical analysis; or
any engineering-related judgment with respect to design adequacy.
Procedures for referring a section 408 application to the head of the applicable Division Office of the Corps of Engineers or an official at the Corps of Engineers headquarters in any case in which a deadline applicable to the section 408 application is not met.
The guidance issued under paragraph (1) shall establish that a completeness review shall be limited to verification that—
all required documents have been submitted;
those documents are in the required format; and
the section 408 application addresses the applicable requirements of the checklist under paragraph (1)(A).
In conducting a completeness review, the Secretary (or a designee) may not—
conduct a detailed technical review of any engineering calculations;
evaluate the design adequacy of, or alternative approaches to, the hydropower project that is the subject of the section 408 application;
request any design modification to, or additional analysis of, the hydropower project that is the subject of the section 408 application;
consider any factor other than a factor included in the standardized checklist under paragraph (1)(A); or
require compliance with any environmental standard that was not established by a Federal or relevant State agency before the date of submission of the section 408 application.
Legislative Timeline
2 actions-
Introduced in Senate
-
Read twice and referred to the Committee on Environment and Public Works.