GRID Power Act

Bill Text

Version IS
This Act may be cited as the Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act.
In this Act:
The term bulk-power system has the meaning given the term in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)).
The term Commission means the Federal Energy Regulatory Commission.
The term dispatchable power means an electric energy generation resource capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability.
The term grid reliability means the ability of the electric grid to deliver an adequate, secure, and stable flow of electricity in the quantity and with the quality demanded by users, taking into account the ability of the bulk-power system to withstand sudden disturbances.
The term grid resilience means the ability of the electric grid to adapt to changing physical conditions and withstand and rapidly recover from significant disturbances, including natural disasters, cyber-attacks, and other unforeseen events.
The term Independent System Operator has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796).
The term Regional Transmission Organization has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796).
The term resource adequacy means the ability of the electric system to meet the aggregate electrical demand and energy requirements of end-use customers at all times, accounting for scheduled and reasonably expected unscheduled outages of bulk-power system components.
The term transmission provider means—
a public utility (as defined in section 201(e) of the Federal Power Act (16 U.S.C. 824(e))) that owns, operates, or controls 1 or more transmission facilities;
an Independent System Operator; and
a Regional Transmission Organization.
Not later than 90 days after the date of enactment of this Act, the Commission shall initiate a rulemaking—
to address the inefficiencies and ineffectiveness of existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably; and
to amend the pro forma Large Generator Interconnection Procedures and, as appropriate, the pro forma Large Generator Interconnection Agreement, promulgated pursuant to section 35.28(f) of title 18, Code of Federal Regulations (or successor regulations)—
to authorize transmission providers to submit proposals to the Commission to adjust the interconnection queue of the transmission provider to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue; and
to require transmission providers—
to provide in any proposal described in subparagraph (A)—
a demonstration of need for prioritization of the relevant projects; and
a description of how the prioritization of those projects will improve grid reliability or grid resilience;
to provide a process for public comment and stakeholder engagement before a proposal described in subparagraph (A) is submitted to the Commission; and
to provide regular reporting to the Commission on the state of grid reliability and grid resilience, including reporting on any actions taken pursuant to this Act.
To ensure timely responses to grid reliability concerns, not later than 60 days after a proposal is submitted pursuant to subsection (a)(2), the Commission shall—
review the proposal; and
approve or deny the proposal.
Not later than 180 days after the date of enactment of this Act, the Commission shall promulgate final regulations to complete the rulemaking initiated under subsection (a).
Not less frequently than once every 5 years, the Commission shall review and, if necessary, update the regulations promulgated under this section to ensure that those regulations remain effective and relevant to evolving grid reliability and grid resilience challenges.

Legislative Timeline

3 actions
  1. Apr 15, 2026 Senate
    Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.
  2. Feb 6, 2025
    Introduced in Senate
  3. Feb 6, 2025 Senate
    Read twice and referred to the Committee on Energy and Natural Resources.
About this civic dataset

About this legislation view

Track federal and state bills and legislation — browse by chamber, status, and day, with summaries and sponsor details, updated daily on Civic Stream.

Use the scope, chamber, status, and search controls to move from the national legislation picture down to an exact state or legislative stage.