S3743
Committee on Energy and Natural Resources
A bill to direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes.
- Federal
- Senate
- Introduced Jan 29, 2026
- Session 119
Bill Text
Version ISThe Secretary of the Interior (acting through the Commissioner of Reclamation) (referred to in this section as the Secretary), in consultation with the Secretary of Energy and Colorado River Storage Project power contractors, shall carry out a feasibility study (including all hydrological modeling) on a selective water withdrawal system at Glen Canyon Dam to optimize hydropower generation when releasing cold water from Glen Canyon Dam, while also preventing entrainment of invasive species, pursuant to the 2016 Long-Term Experimental and Management Plan Record of Decision and the 2024 Long-Term Experimental and Management Plan Supplemental Environmental Impact Statement and Record of Decision.
If the Secretary determines that a selective water withdrawal system alternative studied under subsection (a) is feasible under the reclamation laws, the Secretary may, if the Colorado River Storage Project power contractors concur with the alternative chosen, begin compliance with, and construction of, the chosen alternative.
The Secretary shall complete the feasibility study required under subsection (a) not later than 18 months after the date of enactment of this Act.
The costs of the feasibility study under subsection (a) shall be paid for by the Secretary using appropriated funds.
Any Federal funds made available to carry out this section shall be nonreimbursable and nonreturnable to the United States.
Not later than 90 days after the date of enactment of this Act, the Secretary, in consultation with the Secretary of Energy and Colorado River Storage Project power contractors, shall identify sources of available funds to carry out this section.
Nothing in this section affects the post-2026 Colorado River reservoir operations guidelines and strategies for Lake Powell and Lake Mead in effect before, on, or after the date of enactment of this Act.
If the Secretary determines that a selective water withdrawal system alternative studied under subsection (a) is feasible under the reclamation laws, the Secretary may, if the Colorado River Storage Project power contractors concur with the alternative chosen, begin compliance with, and construction of, the chosen alternative.
The Secretary shall complete the feasibility study required under subsection (a) not later than 18 months after the date of enactment of this Act.
The costs of the feasibility study under subsection (a) shall be paid for by the Secretary using appropriated funds.
Any Federal funds made available to carry out this section shall be nonreimbursable and nonreturnable to the United States.
Not later than 90 days after the date of enactment of this Act, the Secretary, in consultation with the Secretary of Energy and Colorado River Storage Project power contractors, shall identify sources of available funds to carry out this section.
Nothing in this section affects the post-2026 Colorado River reservoir operations guidelines and strategies for Lake Powell and Lake Mead in effect before, on, or after the date of enactment of this Act.
Legislative Timeline
4 actions-
Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.
-
Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held.
-
Introduced in Senate
-
Read twice and referred to the Committee on Energy and Natural Resources.