S3518
Committee on Energy and Natural Resources
FLOWS Act
- Federal
- Senate
- Introduced Dec 17, 2025
- Session 119
Bill Text
Version ISThis Act may be cited as the Fair Licensing for Operations of Water Structures Act or the FLOWS Act.
Section 10(b) of the Federal Power Act (16 U.S.C. 803(b)) is amended by adding at the end the following: Notwithstanding any other requirement of this part, the licensee shall not be required to obtain approval from the Commission for any nonsubstantial alteration or addition to project works under the plans approved by the Commission under section 9(a)(1)..
Section 10(c) of the Federal Power Act (16 U.S.C. 803(c)) is amended by adding at the end the following: Notwithstanding any other requirement of this part, the licensee shall not be required to obtain approval from the Commission for any routine maintenance, repair, or replacement of any portion of a project works necessary to maintain the project works in accordance with this subsection or for any seasonal or temporary adjustments to project operations in response to circumstances beyond the reasonable control of the licensee..
Nothing in this section or an amendment made by this section—
affects any authority of the Federal Energy Regulatory Commission—
to require notice from a licensee under subsection (a) or (b) of section 10 of the Federal Power Act (16 U.S.C. 803); or
to enforce requirements of that section or the terms of a license issued under part I of the Federal Power Act (16 U.S.C. 792 et seq.) with respect to the safety of any dam and appurtenant works and structures; or
precludes any prompt, informal consultation between the licensee and the Federal Energy Regulatory Commission, at the request of the licensee or the Federal Energy Regulatory Commission, with respect to the safety of any dam and appurtenant works and structures in advance of work to be undertaken under section 10 of the Federal Power Act (16 U.S.C. 803); or
affects any authority of the Federal Energy Regulatory Commission to require changes in advance of the work described in subparagraph (A) to protect the safety of any dam and appurtenant works and structures.
Part I of the Federal Power Act (16 U.S.C. 792 et seq.) is amended by adding at the end the following:
In this section, the term micro hydrokinetic energy project—
means a project that—
has or will have an installed capacity of not more than 5 megawatts; and
converts to electric energy the hydrokinetic energy from a generator driven by a turbine from—
waves, tides, or currents in oceans, estuaries, or tidal areas; or
free flowing water in rivers, lakes, streams, or man-made channels; and
does not include a project that impounds water to generate electricity.
The Commission may issue a license in accordance with this section for a term of not less than 10, and not more than 20, years for the construction, operation, and maintenance of project works for a micro hydrokinetic energy project.
An applicant for a license under this section shall commence the licensing process by filing a notification of intent with the Commission.
Notwithstanding section 15(b)(1), an applicant for a license under this section shall file a notification of intent under subparagraph (A) not later than 2 years before the expiration of an existing license, if applicable.
Except as provided in subparagraph (B), an applicant for a license under this section shall submit to the Commission an application not later than 1 year after the date on which the applicant files a notification of intent under paragraph (1).
Notwithstanding section 15(c)(1), an applicant for a license under this section shall file an application with the Commission not later than 1 year before the date of expiration of the term of an existing license, if applicable.
The Commission shall take final action on an application for a license under this section not later than 1 year after the date on which the application is filed under paragraph (2).
To the extent reasonably practicable, the Commission and any applicable conditioning or permitting agencies shall establish, with respect to each micro hydrokinetic energy project that is the subject of a notification of intent to apply for a license under this section, a joint schedule that permits the timely completion of decisions required to be made with respect to, and the timely issuance of, authorizations required under Federal law by the Commission and the conditioning or permitting agencies, subject to the requirement that any joint schedule established under this paragraph shall comply with the deadline for final action established under paragraph (3).
Not later than 180 days after the date of enactment of this section, the Commission shall promulgate regulations to implement this section in a manner that expedites the deployment of micro hydrokinetic energy projects while ensuring the safe operation of the micro hydrokinetic energy project in compliance with applicable Federal and State laws.
The regulations promulgated under paragraph (1) shall provide for the use of 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for low disturbance activities necessary for micro hydrokinetic energy projects.
The Commission shall submit to Congress a report describing the impacts of the micro hydrokinetic energy projects licensed under this section on the environment, the economy, and the reliability and affordability of electricity not later than the earlier of—
the date that is 5 years after the date of enactment of this section; and
the date on which the first 50 micro hydrokinetic energy projects licensed under this section have been operational for not less than 1 year.
Nothing in this section affects any authority of the Commission, at the election of an applicant, to license the construction, operation, and maintenance of project works for a micro hydrokinetic energy project under any other provision of this part.
Section 10(b) of the Federal Power Act (16 U.S.C. 803(b)) is amended by adding at the end the following: Notwithstanding any other requirement of this part, the licensee shall not be required to obtain approval from the Commission for any nonsubstantial alteration or addition to project works under the plans approved by the Commission under section 9(a)(1)..
Section 10(c) of the Federal Power Act (16 U.S.C. 803(c)) is amended by adding at the end the following: Notwithstanding any other requirement of this part, the licensee shall not be required to obtain approval from the Commission for any routine maintenance, repair, or replacement of any portion of a project works necessary to maintain the project works in accordance with this subsection or for any seasonal or temporary adjustments to project operations in response to circumstances beyond the reasonable control of the licensee..
Nothing in this section or an amendment made by this section—
affects any authority of the Federal Energy Regulatory Commission—
to require notice from a licensee under subsection (a) or (b) of section 10 of the Federal Power Act (16 U.S.C. 803); or
to enforce requirements of that section or the terms of a license issued under part I of the Federal Power Act (16 U.S.C. 792 et seq.) with respect to the safety of any dam and appurtenant works and structures; or
precludes any prompt, informal consultation between the licensee and the Federal Energy Regulatory Commission, at the request of the licensee or the Federal Energy Regulatory Commission, with respect to the safety of any dam and appurtenant works and structures in advance of work to be undertaken under section 10 of the Federal Power Act (16 U.S.C. 803); or
affects any authority of the Federal Energy Regulatory Commission to require changes in advance of the work described in subparagraph (A) to protect the safety of any dam and appurtenant works and structures.
Part I of the Federal Power Act (16 U.S.C. 792 et seq.) is amended by adding at the end the following:
In this section, the term micro hydrokinetic energy project—
means a project that—
has or will have an installed capacity of not more than 5 megawatts; and
converts to electric energy the hydrokinetic energy from a generator driven by a turbine from—
waves, tides, or currents in oceans, estuaries, or tidal areas; or
free flowing water in rivers, lakes, streams, or man-made channels; and
does not include a project that impounds water to generate electricity.
The Commission may issue a license in accordance with this section for a term of not less than 10, and not more than 20, years for the construction, operation, and maintenance of project works for a micro hydrokinetic energy project.
An applicant for a license under this section shall commence the licensing process by filing a notification of intent with the Commission.
Notwithstanding section 15(b)(1), an applicant for a license under this section shall file a notification of intent under subparagraph (A) not later than 2 years before the expiration of an existing license, if applicable.
Except as provided in subparagraph (B), an applicant for a license under this section shall submit to the Commission an application not later than 1 year after the date on which the applicant files a notification of intent under paragraph (1).
Notwithstanding section 15(c)(1), an applicant for a license under this section shall file an application with the Commission not later than 1 year before the date of expiration of the term of an existing license, if applicable.
The Commission shall take final action on an application for a license under this section not later than 1 year after the date on which the application is filed under paragraph (2).
To the extent reasonably practicable, the Commission and any applicable conditioning or permitting agencies shall establish, with respect to each micro hydrokinetic energy project that is the subject of a notification of intent to apply for a license under this section, a joint schedule that permits the timely completion of decisions required to be made with respect to, and the timely issuance of, authorizations required under Federal law by the Commission and the conditioning or permitting agencies, subject to the requirement that any joint schedule established under this paragraph shall comply with the deadline for final action established under paragraph (3).
Not later than 180 days after the date of enactment of this section, the Commission shall promulgate regulations to implement this section in a manner that expedites the deployment of micro hydrokinetic energy projects while ensuring the safe operation of the micro hydrokinetic energy project in compliance with applicable Federal and State laws.
The regulations promulgated under paragraph (1) shall provide for the use of 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for low disturbance activities necessary for micro hydrokinetic energy projects.
The Commission shall submit to Congress a report describing the impacts of the micro hydrokinetic energy projects licensed under this section on the environment, the economy, and the reliability and affordability of electricity not later than the earlier of—
the date that is 5 years after the date of enactment of this section; and
the date on which the first 50 micro hydrokinetic energy projects licensed under this section have been operational for not less than 1 year.
Nothing in this section affects any authority of the Commission, at the election of an applicant, to license the construction, operation, and maintenance of project works for a micro hydrokinetic energy project under any other provision of this part.
Legislative Timeline
4 actions-
Committee on Energy and Natural Resources. Ordered to be reported with an amendment in the nature of a substitute favorably.
-
Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held.
-
Introduced in Senate
-
Read twice and referred to the Committee on Energy and Natural Resources.