Version ENRThis Act may be cited as the Sloan Canyon Conservation and Lateral Pipeline Act.
In this Act:
The term Conservation Area means the Sloan Canyon National Conservation Area.
The term Secretary means the Secretary of the Interior, acting through the Director of the Bureau of Land Management.
Section 603(4) of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–1(4)) is amended by striking map entitled Southern Nevada Public Land Management Act and dated October 1, 2002 and inserting map entitled Proposed Sloan Canyon Expansion and dated May 20, 2024.
Section 604(b) of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–2(b)) is amended by striking 48,438 and inserting 57,728.
Section 605 of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–3) is amended by adding at the end the following:
Notwithstanding sections 202 and 503 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1712, 1763) and subject to valid existing rights and paragraph (3), the Secretary of the Interior, acting through the Director of the Bureau of Land Management (referred to in this subsection as the Secretary), shall, not later than 1 year after the date of enactment of this subsection, grant to the Southern Nevada Water Authority (referred to in this subsection as the Authority), not subject to the payment of rents or other charges, the temporary and permanent water pipeline infrastructure, and outside the boundaries of the Conservation Area, powerline, facility, and access road rights-of-way depicted on the map for the purposes of—
performing geotechnical investigations within the rights-of-way; and
constructing and operating water transmission and related facilities.
The Authority may, without consideration, excavate and use or dispose of sand, gravel, minerals, or other materials from the tunneling of the water pipeline necessary to fulfill the purpose of the rights-of-way granted under paragraph (1).
Not later than 30 days after the date on which the rights-of-way are granted under paragraph (1), the Secretary and the Authority shall enter into a memorandum of understanding identifying Federal land on which the Authority may dispose of materials under subparagraph (A) to further the interests of the Bureau of Land Management.
A right-of-way issued under this subsection shall be subject to the following requirements:
The Secretary may include reasonable terms and conditions, consistent with section 505 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1765), as are necessary to protect Conservation Area resources.
Construction of the water pipeline shall not permanently adversely affect conservation area surface resources.
The right-of-way shall not be located through or under any area designated as wilderness.
The expansion of the Conservation Area boundary under the amendment made by subsection (a)—
shall be subject to valid existing rights, including land within a designated utility transmission corridor or a transmission line right-of-way grant approved by the Secretary in a record of decision issued before the date of the enactment of this Act;
shall not preclude—
any activity authorized in accordance with a designated corridor or right-of-way referred to in paragraph (1), including the operation, maintenance, repair, or replacement of any authorized utility facility within the corridor or right-of-way; or
the Secretary from authorizing the establishment of a new utility facility right-of-way within an existing designated transportation and utility corridor referred to in paragraph (1)—
in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable laws; and
subject to such terms and conditions as the Secretary determines to be appropriate.
Except as provided in the amendment made by subsection (b), nothing in this Act or the amendments made by this Act shall modify the management of the Conservation Area pursuant to section 605 of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–3).
In this Act:
The term Conservation Area means the Sloan Canyon National Conservation Area.
The term Secretary means the Secretary of the Interior, acting through the Director of the Bureau of Land Management.
Section 603(4) of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–1(4)) is amended by striking map entitled Southern Nevada Public Land Management Act and dated October 1, 2002 and inserting map entitled Proposed Sloan Canyon Expansion and dated May 20, 2024.
Section 604(b) of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–2(b)) is amended by striking 48,438 and inserting 57,728.
Section 605 of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–3) is amended by adding at the end the following:
Notwithstanding sections 202 and 503 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1712, 1763) and subject to valid existing rights and paragraph (3), the Secretary of the Interior, acting through the Director of the Bureau of Land Management (referred to in this subsection as the Secretary), shall, not later than 1 year after the date of enactment of this subsection, grant to the Southern Nevada Water Authority (referred to in this subsection as the Authority), not subject to the payment of rents or other charges, the temporary and permanent water pipeline infrastructure, and outside the boundaries of the Conservation Area, powerline, facility, and access road rights-of-way depicted on the map for the purposes of—
performing geotechnical investigations within the rights-of-way; and
constructing and operating water transmission and related facilities.
The Authority may, without consideration, excavate and use or dispose of sand, gravel, minerals, or other materials from the tunneling of the water pipeline necessary to fulfill the purpose of the rights-of-way granted under paragraph (1).
Not later than 30 days after the date on which the rights-of-way are granted under paragraph (1), the Secretary and the Authority shall enter into a memorandum of understanding identifying Federal land on which the Authority may dispose of materials under subparagraph (A) to further the interests of the Bureau of Land Management.
A right-of-way issued under this subsection shall be subject to the following requirements:
The Secretary may include reasonable terms and conditions, consistent with section 505 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1765), as are necessary to protect Conservation Area resources.
Construction of the water pipeline shall not permanently adversely affect conservation area surface resources.
The right-of-way shall not be located through or under any area designated as wilderness.
The expansion of the Conservation Area boundary under the amendment made by subsection (a)—
shall be subject to valid existing rights, including land within a designated utility transmission corridor or a transmission line right-of-way grant approved by the Secretary in a record of decision issued before the date of the enactment of this Act;
shall not preclude—
any activity authorized in accordance with a designated corridor or right-of-way referred to in paragraph (1), including the operation, maintenance, repair, or replacement of any authorized utility facility within the corridor or right-of-way; or
the Secretary from authorizing the establishment of a new utility facility right-of-way within an existing designated transportation and utility corridor referred to in paragraph (1)—
in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable laws; and
subject to such terms and conditions as the Secretary determines to be appropriate.
Except as provided in the amendment made by subsection (b), nothing in this Act or the amendments made by this Act shall modify the management of the Conservation Area pursuant to section 605 of the Sloan Canyon National Conservation Area Act (16 U.S.C. 460qqq–3).
Legislative Timeline
27 actions-
Signed by President.
-
Signed by President.
-
Became Public Law No: 119-91.
-
Became Public Law No: 119-91.
-
Presented to President.
-
Presented to President.
-
Message on Senate action sent to the House.
-
Senate Committee on Energy and Natural Resources discharged by Unanimous Consent.
-
Senate Committee on Energy and Natural Resources discharged by Unanimous Consent.
-
Passed/agreed to in Senate: Passed Senate without amendment by Unanimous Consent.
-
Passed Senate without amendment by Unanimous Consent. (consideration: CR S697-699)
-
Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
-
Mr. Stauber moved to suspend the rules and pass the bill.
-
Considered under suspension of the rules. (consideration: CR H5875-5876)
-
DEBATE - The House proceeded with forty minutes of debate on H.R. 972.
-
DEBATE - The House resumed debate on H.R. 972.
-
Passed/agreed to in House: On motion to suspend the rules and pass the bill Agreed to by voice vote. (text: CR H5875)
-
On motion to suspend the rules and pass the bill Agreed to by voice vote. (text: CR H5875)
-
Motion to reconsider laid on the table Agreed to without objection.
-
Reported by the Committee on Natural Resources. H. Rept. 119-279.
-
Reported by the Committee on Natural Resources. H. Rept. 119-279.
-
Placed on the Union Calendar, Calendar No. 235.
-
Committee Consideration and Mark-up Session Held
-
Ordered to be Reported by Unanimous Consent.
-
Introduced in House
-
Introduced in House
-
Referred to the House Committee on Natural Resources.