All bills
HR3157 On Union Calendar

State Energy Accountability Act

Bill Text

Version RH
This Act may be cited as the State Energy Accountability Act.
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
Each State regulatory authority that implements an intermittent energy policy shall conduct, and make publicly available, a general evaluation of—
the effects of implementing the intermittent energy policy on the reliability of the bulk-power system in the State, including an assessment of the adequacy of available electric energy resources over a 10-year period;
the ability of electric energy resources that comply with the requirements of the intermittent energy policy to meet electric energy demand during emergencies, periods of high demand, or extreme weather events;
the effects of implementing the intermittent energy policy on rates charged by electric utilities;
whether reliable generation facilities that are removed from service in order to comply with the requirements of the intermittent energy policy can be replaced with sufficient electric generation facilities meeting such requirements, which have a capacity accreditation that is equivalent to the capacity accreditation of the removed facilities, to maintain the reliability of the bulk-power system in the State; and
the extent to which implementation of the intermittent energy policy requires electric utilities in the State to use replacement electric energy supplies that are generated by reliable generation facilities located outside the State in order to maintain the reliability of the bulk-power system in the State.
Notwithstanding section 124 and paragraphs (1) and (2) of section 112(a), each State regulatory authority shall consider and make a determination concerning the standard set out in subparagraph (A) in accordance with the requirements of subsections (a) and (b) of this section, without regard to any proceedings commenced prior to the enactment of this paragraph.
Notwithstanding subsections (b) and (c) of section 112, each State regulatory authority shall consider and make a determination concerning whether it is appropriate to implement the standard set out in subparagraph (A) not later than 1 year after the date of enactment of this paragraph.
A State regulatory authority that has made a determination concerning whether to implement, and is implementing, the standard set out in subparagraph (A) shall make publicly available the general evaluation described in such subparagraph—
if the applicable State has adopted an intermittent energy policy before the date on which the State regulatory authority makes such determination, not later than 1 year after such date of determination; and
if the applicable State adopts an intermittent energy policy after the date on which the State regulatory authority makes such determination, not later than 1 year after the date of such adoption.
In this paragraph:
The term bulk-power system has the meaning given that term in section 215 of the Federal Power Act (16 U.S.C. 824o).
The term intermittent energy policy means any requirement of a State, enforced by a State regulatory authority, that a State regulated electric utility ensure that a specified portion of the electric energy sold by such electric utility is generated by facilities that are not reliable generation facilities.
The term reliable generation facility means an electric generation facility that ensures the reliable availability of electric energy by—
having operational characteristics to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days;
having—
adequate fuel, or a continuously available energy source, on-site to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days; or
contractual obligations that ensure adequate fuel supply to achieve the generation of electric energy on a continuous basis for a period of not fewer than 30 days;
having operational characteristics to enable the generation of electric energy during emergency and severe weather conditions; and
providing essential services related to the reliable availability of electric energy, including frequency support and voltage support.

Legislative Timeline

11 actions
  1. Sep 17, 2025
    Reported by the Committee on Energy and Commerce. H. Rept. 119-301.
  2. Sep 17, 2025 House
    Reported by the Committee on Energy and Commerce. H. Rept. 119-301.
  3. Sep 17, 2025 House
    Placed on the Union Calendar, Calendar No. 255.
  4. Jun 25, 2025 House
    Committee Consideration and Mark-up Session Held
  5. Jun 25, 2025 House
    Ordered to be Reported by the Yeas and Nays: 27 - 20.
  6. Jun 5, 2025 House
    Subcommittee Consideration and Mark-up Session Held
  7. Jun 5, 2025 House
    Forwarded by Subcommittee to Full Committee by Voice Vote.
  8. Jun 3, 2025 House
    Referred to the Subcommittee on Energy.
  9. May 1, 2025
    Introduced in House
  10. May 1, 2025
    Introduced in House
  11. May 1, 2025 House
    Referred to the House Committee on Energy and Commerce.
About this civic dataset

About this legislation view

Track federal and state bills and legislation — browse by chamber, status, and day, with summaries and sponsor details, updated daily on Civic Stream.

Use the scope, chamber, status, and search controls to move from the national legislation picture down to an exact state or legislative stage.